人人人妻人人澡人人爽欧美一区,国产草b视频,91av男人天堂,免费无码国产一级AⅤ片

Welcome to Changzhou painuo Electronic Co. ltd.!
contact
  • General manager: Mr.Wang
  • Phone: +86-13382882032
  • Tel: +86-519-83331905
  • Fax: +86-519-89185073
  • Web: www.660ep.com
  • E-mail: wkfpainuo@163.com
  • Add: No.15, Xinhu Road, Xueyan Town, Wujin District, Changzhou City
problem
Position:Home > problem >

Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
日本三级在线播放| 精品久久久久久狼人社区| 国产精品剧情自拍你懂的| 五十路昭和超熟女AV| 五月天婷亚洲天综合网鲁鲁鲁| 一区二区三区不卡中文字幕| 亚洲一区国产二区日本三区| 欧洲色图区| 日本不卡免费一区二区三区| 国产男无套gvonline无套| 藤浦惠视频在线| 亚洲精品日本国产一区二区| 一对浑圆的胸乳被揉捏电影| なる五十路熟女12人4时间| 青青草国产青春综合久久| 亚洲变态另类调教久久久| 中文字幕色av| 一区二区三区97| 天天躁日日躁白天躁晚上躁| 国产国一国二wwwwww| 色综合综合在线| 骚虎成人影院| 久久久女同av一区二区| 国产欧美久久久一区二区 | 国产精品久久久亚洲不卡| 久久久中文字幕一区二区| 小说 亚洲 无码 精品| 成全观看高清完整版免费动漫电影| 午夜精品一区二区三区免费视频 | 天天看免费电影在线观看| 日本老师调教丰满的少妇| 久久91婷婷| 教室里被老师揉到高潮视频 | 国产精品高清一区二区三区不卡 | 日本一区二区三区在线免费 | 亚洲女同按摩HD| 国产精品久久久久福利电影| 成人国产亚洲精品一区二| 我,我天天要操你的骚逼| 大战丰满人妻Bww| 大炕上泄欲的老女人|